Thursday, April 19, 2012
Sunday, April 8, 2012
Progress
Making progress, all the gas is hooked up and working, fresh water tank and water heater are plumbed in and water lines are installed back to the bathroom.
My wife and I talked to our upholstery guy and picked out our seat cushions.
Started installing the black tank today, I haven't been looking forward to this but so far so good!
Our battery came in the mail !
Made a splash guard for the stove.
Installed a couple more cabinet doors.
Installed the main door gasket now that the cabinets are in and I wanted the rivets to show on the inside.
We had a surprise storm that found Nellie outside in the hail but luckily no damage.
Sunday, March 25, 2012
Starting to feel Usable
After some computer and camera troubles everything is back on track. We made some pretty good progress this last week and the cruiser is starting to feel complete.
Rear full size bed that replaced the two twins
Bad picture but wardrobe got a little smaller,
refrigerator cabinet is in the same spot just shorter, original was full height
Thiscabinet is about the same but missing the cooktop that was here originally.
The sink base is a little tight to get through the door.
Had some good help!
Thanks Ben
New faucet is in, donated by a plumbing friend, sink is mounted after two try's. I had the cabinet upside down
and thought for sure everything was in position, i mounted and sealed the sink in place, turned the cabinet over and found I had the sink turned a 180 degrees and the drains were in the front of the sink:-)
I took everything off the stove that I could, cleaned and painted everything
Used a door edge molding to trim the upper cabinets.
New knotty pine flooring should match well, another donation from a flooring friend.
Need to find or build the right table yet
Just a simple towel rack I found in my Dads shop, fits well.
Rear full size bed that replaced the two twins
Bad picture but wardrobe got a little smaller,
refrigerator cabinet is in the same spot just shorter, original was full height
Thiscabinet is about the same but missing the cooktop that was here originally.
The sink base is a little tight to get through the door.
Had some good help!
Thanks Ben
New faucet is in, donated by a plumbing friend, sink is mounted after two try's. I had the cabinet upside down
and thought for sure everything was in position, i mounted and sealed the sink in place, turned the cabinet over and found I had the sink turned a 180 degrees and the drains were in the front of the sink:-)
I took everything off the stove that I could, cleaned and painted everything
Used a door edge molding to trim the upper cabinets.
New knotty pine flooring should match well, another donation from a flooring friend.
Need to find or build the right table yet
Just a simple towel rack I found in my Dads shop, fits well.
Wednesday, March 14, 2012
Cabinets and more painting
The cabinets are 90% done and final finish is on. We decided to do one more coat of paint inside to touch up all the scuffs from building the cabinets over the last year. Now we just have to watch the paint dry, I really want to install cabinets permanently and sometimes I am not the most patient!
The next post should look quite bit different with cabinets in!!
Sunday, March 4, 2012
Subscribe to: