I feel we are in the home stretch, two and half weeks to go before our first although short weekend camping trip with Nellie! We are excited for the weekend but lots of things left to do:
-Finish plumbing-tanks and water to bathroom-Install cabinet doors
-Install screens and window cranks
-Install floors
-Polish outside
-Finish curtains
-Pack camper
Installed the tin walls, we like the contrast with the new stainless steal floor.
Installed the shower hardware, we picked this up at architectural salvage store.
Jan has been busy making curtains.
Just a few more things left to do and we will be ready to role, I thought this time would never come!
Love the 'tin' sheeting, very nice contrast to the stainless steel.
ReplyDeleteNice work.
Chris
Thanks Chris, My wife's idea for the tin.
Delete